Qwen3.8-Flash-Next
Performance benchmark · measured on 21.10.2026 09:48
run-20261021-093816-154b4ePerformance benchmark · Primary metric: Generation-Speed (tok/s) · 1× concurrent
Wie schlägt sich dieser Benchmark mit anderen Modellen?
How does this benchmark compare on other GPUs?
Same model on different hardware · 1× concurrent · Generation (tok/s)
Hardware
GPU: NVIDIA Tesla V100 PCIe 32GB · 32 GB VRAM
CPU: 4x Intel(R) Xeon(R) CPU E5-4657L v2 @ 2.40GHz
RAM: 504 GB
Mainboard: Dell Inc. PowerEdge R820
Setup
Runtime: strata
Quantization: IQ3_S
Model: Qwen3.8-Flash-Next
Configuration
| execution_type | local |
Qwen3.8-Flash-Next on various hardware
All published performance runs of this model – each bubble a variant: position = prefill (X) × generation (Y), bubble size = number of runs. Closer to the top right = faster. ★ Marked gold = this benchmark.
GPUby graphics card
CPUby processor
MBby mainboard
DRVby driver
Economics of this run
Operating cost, TCO and comparison with the next-best runs of the same model at identical concurrency (1× concurrent). Methodology →
All values above and the charts below take the configured system utilization into account: at X% the system generates only X% of the time, the rest it idles (35 W). Cost per hour drops (more idle), cost per token rises.
Cost over 2 years – electricity only
Cost over 2 years – incl. acquisition (TCO)
Speed vs. tokens per euro
Euro per 1M tokens
Comparison vs. API – economics per benchmark
| Qwen3.8-Flash-NextNVIDIA Tesla V100 PCIe 32GB | Qwen3.8-Flash-NextNVIDIA RTX PRO 6000 Blackwell Max-Q Workstation Edition | Qwen3.8-Flash-NextNVIDIA RTX PRO 6000 Blackwell Max-Q Workstation Edition | Qwen3.8-Flash-NextNVIDIA RTX A6000 | |
|---|---|---|---|---|
| Electricity cost (24 mo.) | – | – | – | – |
| Acquisition cost | – | – | – | – |
| Total cost (TCO) | – | – | – | – |
| Generated tokens (24 mo.) | – | – | – | – |
| Token price via API | – | – | – | – |
| Break-even point (days) | – | – | – | – |
| Result (savings / extra cost) | – | – | – | – |
Comparison with up to 3 next-best runs of this model at the same concurrency (at least one on different hardware). Power = GPU TDP + CPU (idle + 15 %) + board (estimated), acquisition = full system (GPU + CPU + board + RAM + PSU), prices = stored market prices.


